科技报告详细信息
T Plant Overpack Tiedown Analysis.
Riley, D. L.
Technical Information Center Oak Ridge Tennessee
关键词: Fuel processing plants;    Safety analysis;    Hanford Reservation;    Packaging;    Overpack;   
RP-ID  :  DE2003804236
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

This tiedown evaluation meets the requirement imposed by HNF-6550, Safety Evaluation for Packaging (Onsite) T PIant Canyon Items (O'Brien 2000). O'Brien (2000) requires that any items prepared for shipment from T Plant to the burial grounds that are not bounded by the analysis in 0'Brien (2000) must have a separate, approved, engineered tiedown analysis. The width of the overpack box is 9 ft 7 in. This width is wider than the maximum width authorized in O'Brien (2000), which is 8 ft.

【 预 览 】
附件列表
Files Size Format View
DE2003804236.pdf 692KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:10次