科技报告详细信息
Columbia River Treaty 2014/2024 Review. United States Entity Supplemental Report. Appendix C.
Technical Information Center Oak Ridge Tennessee
关键词: Water resources;    Rivers;    Treaties;    Electric power generation;    Hydroelectric power;   
RP-ID  :  PB2011111164
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

In general, the planning and operation of the Canadian Treaty projects does not recognize operations not defined in the actual Treaty or Treaty Protocol. Since the Phase 1 studies were primarily focused on looking at the two fundamental river purposes defined under the Treaty, power and flood control, the studies did not include additional operations not considered under the Treaty. By approaching the Phase 1 studies from this Treaty standpoint, both the U.S. and Canadian Entities believed they created a baseline of information for comparison and to build from for future studies and for engagement with the sovereigns and stakeholders within their respective countries. However, since the Biological Opinions (BiOp) have such a strong influence on the U.S. operations, the U.S. Entity felt it was important to look at the Phase 1 study results with the Fish operations included. The purpose of this appendix is to describe the modeling, methodology and criteria used in the U.S. Entity Phase 1 Supplemental studies that were done to assess the impacts to the U.S. system and fish operations when BiOp requirements were overlaid on the Phase 1 studies. The Phase 1 studies referred to in this appendix are: 1. Treaty continues post-2024 and Called Upon flood control is implemented (Study A); 2. Treaty is terminated in 2024 and Called Upon flood control is implemented (Study B); and 3. Treaty continues post-2024 with largely the same Treaty operations as today (Study C). The purpose of this Appendix is to compare across Supplemental studies only.

【 预 览 】
附件列表
Files Size Format View
PB2011111164.pdf 630KB PDF download
  文献评价指标  
  下载次数:23次 浏览次数:24次