科技报告详细信息
BNL Super Neutrino Beam Project.
Weng, W. T. ; Raparia, D.
Technical Information Center Oak Ridge Tennessee
关键词: Neutrino beams;    Linear accelerators;    Amplitudes;    Beam dynamics;    Design;   
RP-ID  :  DE200515010023
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

To determine the neutrino mixing amplitudes and phase accurately, as well as the CP violation parameters, a very long base line super neutrino beam facility is needed. This is possible due to the long distance and wideband nature of the neutrino beam for the observation of several oscillations from one species of the neutrino to the other (1,2). BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW and beyond for such a neutrino facility which consists of three major subsystems. First is a 1.5 GeV superconducting linac to replace the booster as injector for the AGS, second is the performance upgrade for the AGS itself for the higher intensity and repetition rate, and finally is target and horn system for the neutrino production. The major contribution for the higher power is from the increase of the repetition rate of the AGS form 0.3 Hz to 2.5 Hz, with moderate increase from the intensity (3). The design consideration to achieve high intensity and low losses for the linac and the AGS will be reviewed. The target horn design for high power operation and easy maintenance will also be presented.

【 预 览 】
附件列表
Files Size Format View
DE200515010023.pdf 535KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:12次