YMP Engineered Barrier Systems Scaled Ventilation Testing.
Dunn, S. D. ; Lowry, B. ; Walsh, B. ; del Mar, J. ; Howard, C. ; Williams, T. ; Johnston, R.
Technical Information Center Oak Ridge Tennessee
关键词: Underground facilities;    Ventilation;    Yucca Mountain;    Heat transfer;    Underground storage;   
RP-ID  :  DE2004808017
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
Yucca Mountain, approximately 100 miles northwest of Las Vegas, Nevada, has been selected as the site for the nation's first geologic repository for high level nuclear waste. The Yucca Mountain Project (YMP) is currently developing the design for the underground facilities. Ventilation is a key component of the design as a way to maintain the desired thermal conditions in the emplacement drifts prior to closure. As a means of determining the effects of continuous ventilation on heat removal from the emplacement drifts two series of scaled ventilation tests have been performed. Both test series were performed in the DOE/North Las Vegas Atlas facility. The tests provided scaled (nominally 25% of the full scale emplacement drift design) thermal and flow process data that will be used to validate YMP heat and mass transport codes. The Phase I Ventilation Test series evaluated the ability of ambient ventilation air to remove energy under varying flow and input power conditions. The Phase II Ventilation Test series evaluated the ability of pre-conditioned ventilation air to remove energy under varying flow, input temperature and moisture content, and simulated waste package input power conditions. Twenty-two distinct ventilation tests were run.
【 预 览 】
附件列表
Files Size Format View
DE2004808017.pdf 518KB PDF download
  文献评价指标  
  下载次数:2次 浏览次数:7次