科技报告详细信息
Establishment of an Environmental Control Technology Laboratory with a Circulating Fluidized-Bed Combustion System. Quarterly Technical Progress Report for April 1-June 30, 2005.
Pan, W. P. ; Wu, A. ; Riley, J. Y.
Technical Information Center Oak Ridge Tennessee
关键词: Combustion laboratory;    Fluidized-bed combustion;    Environmental control;    Energy;    Tables(Data);   
RP-ID  :  DE2005843076
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
This purpose of this report is to present the progress made on the project Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System during the period April 1, 2005 through June 30, 2005. The following tasks have been completed. First, the new Combustion Laboratory was occupied on June 15, 2005, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final painting stage. Second, the fabrication and manufacturing contract for the CFBC Facility was awarded to Sterling Boiler & Mechanical, Inc. of Evansville, Indiana. Sterling is manufacturing the assembly and component parts of the CFBC system. The erection of the CFBC system is expected to start September 1, 2005. Third, mercury emissions from the cofiring of coal and chicken waste was studied experimentally in the laboratory-scale simulated fluidized-bed combustion facility. The experimental results from this study are presented in this report. Finally, the proposed work for the next quarter is described.
【 预 览 】
附件列表
Files Size Format View
DE2005843076.pdf 380KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:31次