科技报告详细信息
Construction of a Post-Irradiated Fuel Examination Shielded Enclosure Facility.
Lehto, M. A. ; Christensen, B. D.
Technical Information Center Oak Ridge Tennessee
关键词: Construction;    Post-irradiation examination;    Research and test reactors;    Ion beams;    Electron probes;   
RP-ID  :  DE2008940030
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The U.S. Department of Energy (DOE) has committed to provide funding to the Idaho National Laboratory (INL) for new post-irradiation examination (PIE) equipment in support of advanced fuels development. This equipment will allow researchers at the INL to accurately characterize the behavior of experimental test fuels after they are removed from an experimental reactor also located at the INL. The accurate and detailed characterization of the fuel from the reactor, when used in conjunction with computer modeling, will allow DOE to more quickly understand the behavior of the fuel and to guide further development activities consistent with the missions of the INL and DOE. Due to the highly radioactive nature of the specimen samples that will be prepared and analyzed by the PIE equipment, shielded enclosures are required. The shielded cells will be located in the existing Analytical Laboratory (AL) basement (Rooms B-50 and B-51) at the INL Material and Fuels Complex (MFC). AL Rooms B-50 and B-51 will be modified to establish an area where sample containment and shielding will be provided for the analysis of radioactive fuels and materials while providing adequate protection for personnel and the environment. The area is comprised of three separate shielded cells for PIE instrumentation. Each cell contains an atmosphere interface enclosure (AIE) for contamination containment. The shielding will provide a work area consistent with the as-low-as-reasonably-achievable (ALARA) concept, assuming a source term of 10 samples in each of the three shielded areas. Source strength is assumed to be a maximum of 3 Ci at 0.75 MeV gamma for each sample. Each instrument listed below will be installed in an individual shielded enclosure: Shielded electron probe micro-analyzer (EPMA) Focused ion beam instrument (FIB) Micro-scale x-ray diffractometer (MXRD). The project is designed and expected to be built incrementally as funds are allocated. The initial phase will be to fund the construction activities, which will include facility modifications and construction of one shielded enclosure. Follow-up activities will be to construct two additional shielded enclosures to complete the suite of three separate but connected remote operated examination areas.

【 预 览 】
附件列表
Files Size Format View
DE2008940030.pdf 332KB PDF download
  文献评价指标  
  下载次数:16次 浏览次数:4次