科技报告详细信息
Abort Gap Cleaning in RHIC.
Drees, A. ; Ahrens, L. ; Fliller, R. ; Gassner, D. ; McIntyre, G. T. ; Michnoff, R. ; Trbojevic, D.
Technical Information Center Oak Ridge Tennessee
关键词: Gap cleaning;    Debunching;    Magnet quenching;    Kickers;    Triggers;   
RP-ID  :  DE2003804613
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

During the RHIC Au-run in 2001 the 200 MHz storage cavity system was used for the first time. The rebucketing procedure caused significant beam debunching in addition to amplifying debunching due to other mechanisms. At the end of a four hour store, debunched beam could account for approximately 30%-40% of the total beam intensity. Some of it will be in the abort gap. In order to minimize the risk of magnet quenching due to uncontrolled beam losses at the time of a beam dump, a combination of a fast transverse kicker and copper collimators were used to clean the abort gap. This report gives an overview of the gap cleaning procedure and the achieved performance.

【 预 览 】
附件列表
Files Size Format View
DE2003804613.pdf 278KB PDF download
  文献评价指标  
  下载次数:18次 浏览次数:6次