科技报告详细信息
Project Turnover Deliverables for the SY Farm Enraf Annulus Leak Detectors.
Scaief, C. C.
Technical Information Center Oak Ridge Tennessee
关键词: Leak detectors;    Radioactive storage facilities;    Project management;    Annular space;    Documentation;   
RP-ID  :  DE2003804764
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

This document identifies the deliverables that ensure the end user of the SY Farm Enraf Annulus Leak Detectors (ALD) has all the documentation and training required for operating and maintaining the new system. All deliverable items checked on the Acceptance For Beneficial Use (ABU) form have been completed and are available to the end user. This document was written as required by HNF-IP-0842, Volume IV section 3.12 Acceptance of Structures, Systems, and Components for Beneficial Use. This document applies to the deliverable documentation required to operate and maintain the SY Farm Enraf ALD System. Appendix A provides a copy of the ABU form as listed in the appendix of TWR-4092, Engineering Task Plan for the New SY Farm Annulus Leak Detectors. This document attests that all required deliverable items checked on the ABU have been completed and are available to the end user.

【 预 览 】
附件列表
Files Size Format View
DE2003804764.pdf 260KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:24次