科技报告详细信息
Tank 4 Characterization, Settling, and Washing Studies.
Bannochie, C. J. ; Pareizs, J. M. ; Click, D. R. ; Zamecnik, J. R.
Technical Information Center Oak Ridge Tennessee
关键词: Radioactive waste storage;    Sludges;    Analytical methods;    Chemical analysis;    Rheology methods;   
RP-ID  :  DE2009966144
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
A sample of PUREX sludge from Tank 4 was characterized, and subsequently combined with a Tank 51 sample (Tank 51-E1) received following Al dissolution, but prior to a supernate decant by the Tank Farm, to perform a settling and washing study to support Sludge Batch 6 (SB6) preparation. The sludge source for the majority of the Tank 51-E1 sample is Tank 12 HM sludge. The Tank 51-E1 sample was decanted by Savannah River National Laboratory (SRNL) prior to use in the settling and washing study. The Tank 4 sample was analyzed for chemical composition including noble metals. The characterization of the Tank 51-E1 sample, used here in combination with the Tank 4 sample, was reported previously. SRNL analyses on Tank 4 were requested by Liquid Waste Engineering (LWE) via Technical Task Request (TTR) HLE-TTR-2009-103. The sample preparation work is governed by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were controlled by an Analytical Study Plan and modifications received via customer communications. Additional scope included a request for a settling study of decanted Tank 51-E1 and a blend of decanted Tank 51-E1 and Tank 4, as well as a washing study to look into the fate of undissolved sulfur observed during the Tank 4 characterization. The chemistry of the Tank 4 sample was modeled with OLI Systems, Inc. StreamAnalyzer to determine the likelihood that sulfate could exist in this sample as insoluble Burkeite (2Na2SO4DTNa2CO3). The OLI model was also used to predict the composition of the blended tank materials for the washing study. One 1-L sample of Tank 4 was pulled on July 20, 2009 following slurry operations. The sample was designated FTF-04-09-32 by F-Tank Farm Operations. The sample was sent to SRNL on July 21, 2009.
【 预 览 】
附件列表
Files Size Format View
DE2009966144.pdf 240KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:13次