科技报告详细信息
Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System Step 1: Review and Critique of Implementation Plans.
Neitzel, D. A. ; Bunn, A.
Technical Information Center Oak Ridge Tennessee
关键词: Fishes;    Natural resources management;    Implementation;    Planning;    Performance;   
RP-ID  :  DE2001776671
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

The Bonneville Power Administration, Corps of Engineers, and Bureau of Reclamation (Action Agencies) will be developing 1- and 5-year implementation plans for the Draft Biological Opinion on Operation of the Federal Columbia River Power System developed by the National Marine Fisheries Service. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards for the Biological Opinion. The first step for developing the implementation plan was to determine the organizational structure of the plan. A review of implementation plans concerning natural resource management was conducted to evaluate the elements of plans and determine the applicability of the best elements to the draft implementation plan.

【 预 览 】
附件列表
Files Size Format View
DE2001776671.pdf 230KB PDF download
  文献评价指标  
  下载次数:22次 浏览次数:18次