科技报告详细信息
Final Technical Report for UTSI/CFFF MHD Program Completion and Related Activity. Report for September 15, 1995-March 14, 2005.
Muehlhauser, J. W.
Technical Information Center Oak Ridge Tennessee
关键词: MHD generator CFFF;    Remedial action;    Ground water;    Monitoring;    Removal;   
RP-ID  :  DE2004833401
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

In this final technical report, UTSI summarizes work completed under DOE Contract No. DE-AC22-95PC95231. This work began on the contract effective date, September 15, 1995 and is continuing on a very small basis to complete the groundwater remediation as of this date. The work scope required UTSI to continue to maintain the DOE Coal Fired Flow Facility and keep it in readiness for anticipated testing. This effort was terminated in September 1998 by DOE stop-work letter. Work continued on reporting, environmental restoration and on the High Temperature Superconductivity work that was underway. The work included preparing reports on the MHD POC tests that had been completed just prior to this contract initiation under an earlier contract with DOE Chicago. These four reports are summarized herein. This report summarizes the environmental restoration work performed under the contract, including groundwater monitoring and remediation, removal of wastes from the facility, removal of asbestos from the cooling tower and actions in compliance with the license to discharge water into Woods Reservoir.

【 预 览 】
附件列表
Files Size Format View
DE2004833401.pdf 219KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:17次