科技报告详细信息
Gas/Liquid Membranes for natural Gas Upgrading. Quarter Report No. 9.
Meyer, H. S.
Technical Information Center Oak Ridge Tennessee
关键词: Natural gas;    Site selection;    Membranes;    Construction;    Dehydration;   
RP-ID  :  DE2004822675
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
Efforts this quarter have concentrated on field site selection. ChevronTexaco has signed a contract with Kvaerner process Systems for the 50 MM scf/d dehydration skid at their Headlee Gas Plant in Odessa, TX for a commercial-scale test. This will allow the test to go forth. A new test schedule was established with testing beyond the existing contract completion date. Potting and module materials testing continued. Construction of the bench-scale equipment was started. Additional funding to support the test was obtained through a contract with Research Partnership for Secure Energy for America.
【 预 览 】
附件列表
Files Size Format View
DE2004822675.pdf 213KB PDF download
  文献评价指标  
  下载次数:21次 浏览次数:38次