Development of an Inspection Platform and a Suite of Sensors for Assessing Corrosion and Mechanical Damage on Unpiggable Transmission Mains. Quarterly Report of the Period of January 1, 2003 to March 31, 2003.
The present report summarizes the accomplishments of the project during its second three-month period (from January 2003 through March 2003). The project was initiated with delay in February 2003 due to contractual issues that emerged between the NGA and Foster-Miller, Inc. The two organizations are working diligently to maintain the program's pace so that it is completed in time. The efforts of the project focused during this period in the assessment of the tether technology that is intended to be used as the means of communication between robot and operator. Preliminary results indicate that tether is a viable option under certain pipeline operating conditions but not all. The exact range of operating conditions that are viable for tether use are being determined as the study progresses. Work was also initiated regarding the design of the robotic platform.