科技报告详细信息
Just in Time DSA The Hanford Nuclear Safety Basis Strategy.
Technical Information Center Oak Ridge Tennessee
关键词: Nuclear safety;    Hanford site;    Standards;    Radioactive wastes;    Hazards;   
RP-ID  :  DE2004833333
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
The U.S. Department of Energy, Richland Operations Office (RL) is responsible for 30 hazard category 2 and 3 nuclear facilities that are operated by its prime contractors, Fluor Hanford Incorporated (FHI), Bechtel Hanford, Incorporated (BHI) and Pacific Northwest National Laboratory (PNNL). The publication of Title 10, Code of Federal Regulations, Part 830, Subpart B, Safety Basis Requirements (the Rule) in January 2001 imposed the requirement that the Documented Safety Analyses (DSA) for these facilities be reviewed against the requirements of the Rule. Those DSA that do not meet the requirements must either be upgraded to satisfy the Rule, or an exemption must be obtained. RL and its prime contractors have developed a Nuclear Safety Strategy that provides a comprehensive approach for supporting RL's efforts to meet its long term objectives for hazard category 2 and 3 facilities while also meeting the requirements of the Rule. This approach will result in a reduction of the total number of safety basis documents that must be developed and maintained to support the remaining mission and closure of the Hanford Site and ensure that the documentation that must be developed will support: Compliance with the Rule A 'Just-In-Time' approach to development of Rule-compliant safety bases supported by temporary exemptions Consolidation of safety basis documents that support multiple facilities with a common mission (e.g. decontamination, decommissioning and demolition (DD&D), waste management, surveillance and maintenance). This strategy provides a clear path to transition the safety bases for the various Hanford facilities from support of operation and stabilization missions through DD&D to accelerate closure. This 'Just-In-Time' Strategy can also be tailored for other DOE Sites, creating the potential for large cost savings and schedule reductions throughout the DOE complex
【 预 览 】
附件列表
Files Size Format View
DE2004833333.pdf 151KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:24次