科技报告详细信息
Urban Wood/Coal Co-Firing in the Bellefield Boilerplant. Final Report.
Cobb, J. T. ; Geiger, G. E. ; Elder, W. W. ; Barry, W. P.
Technical Information Center Oak Ridge Tennessee
关键词: Cocombustion;    Biomass;    Coal;    Wood;    Boilers;   
RP-ID  :  DE2005838442
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

An Environmental Questionnaire for the demonstration at the Bellefield Boiler Plant (BBP) was submitted to the national Energy Technology Laboratory. An R&D variance for the air permit at the BBP was sought from the Allegheny County Health Department (ACHD). R&D variances for the solid waste permits at the J. A. Rutter Company (JARC), and Emery Tree Service (ETS) were sought from the Pennsylvania Department of Environmental Protection (PADEP). Construction wood was acquired from Thompson Properties and Seven D Corporation. Verbal authorizations were received in all cases. Memoranda of understanding were executed by the University of Pittsburgh with BBP, JARC and ETS. Construction wood was collected from Thompson Properties and from Seven D Corporation. Forty tons of pallet and construction wood were ground to produce BioGrind Wood Chips at JARC and delivered to Mon Valley Transportation Company (MVTC). Five tons of construction wood were hammermilled at ETS and half of the product delivered to MVTC. Blends of wood and coal, produced at MVTC by staff of JARC and MVTC, were shipped by rail to BBP. The experimental portion of the project was carried out at BBP in late March and early April 2001. Several preliminary tests were successfully conducted using blends of 20% and 33% wood by volume.

【 预 览 】
附件列表
Files Size Format View
DE2005838442.pdf 140KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:25次