科技报告详细信息
Rush to Remediate: Long Term Performance Favors Passive Systems at the Savannah River Site (SRS).
Hoffman, W. D. ; Cauthen, R. K. ; Beul, R. R.
Technical Information Center Oak Ridge Tennessee
关键词: Savannah River Plant;    Ground water;    Remediation;    Water treatment;    Water contamination;   
RP-ID  :  DE2004825869
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】
The purpose of this paper is to describe the long-term performance of groundwater remediation systems at SRS and compare active versus passive systems. The presentation will focus on the limited effectiveness of active pump and treat systems and share the experience with more passive and natural systems such as soil vapor extraction, barometric pumping, bioremediation, and phytoremediation. Three remediation projects are presented. In each case the waste source is capped with clay or synthetic barriers; however, extensive groundwater contamination remains. The first project features the cleanup of the largest plume in the United States. The second project entails solvent and vinyl chloride remediation of groundwater beneath a hazardous waste landfill. The third project discusses tritium containment from a 160-acre radioactive waste disposal area. Special emphasis is placed on performance data from alternate technology cleanup. The goals are to share remediation data, successes and lessons learned, while making a case for passive systems use in groundwater remediation.
【 预 览 】
附件列表
Files Size Format View
DE2004825869.pdf 115KB PDF download
  文献评价指标  
  下载次数:2次 浏览次数:11次