关键词: Combined-cycle power plants;    Turbines;    Technology;    Bearings;    Combined cycles;   
RP-ID  :  DE2001780452
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

Much of the 'H' technology design is based on proven, established technologies. The major technologies of the combined cycle powertrain, including the bearing designs, the evaluation methods for rotor dynamics, the compressor and turbine blading designs, and the generator field construction methods are all either direct applications of proven design technology or evolutionary refinement of existing designs. It is for these reasons that GE expects that the reliability of the new 'H' Class generating system will be fully commensurate with the levels associated with today 'F' Class combined cycle power plants. With maintenance and operations performed at 'best practice' levels, the new 'H' Class plant should reach its full reliability potential of 97.0% or better.

【 预 览 】
附件列表
Files Size Format View
DE2001780452.pdf 51KB PDF download
  文献评价指标  
  下载次数:7次 浏览次数:11次