科技报告详细信息
Oak Ridge National Laboratory Radiation Control Program-Partners in Site Restoration.
Jones, S. L. ; Stafford, M. W.
Technical Information Center Oak Ridge Tennessee
关键词: ORNL;    Radiation protection;    Program management;    Contractors;    Decommissioning;   
RP-ID  :  DE2004829617
学科分类:工程和技术(综合)
美国|英语
来源: National Technical Reports Library
PDF
【 摘 要 】

In 1998, the U.S. Department of Energy (DOE) awarded the Management and Integration (M&I) contract for all five of the Oak Ridge Operations (ORO) facilities to Bechtel Jacobs Company LLC (BJC). At Oak Ridge National Laboratory (ORNL), a world renowned national laboratory and research and development facility, the BJC mission involves executing the DOE Environmental Management (EM) program. In addition to BJC's M&I contract, UT-Battelle, LLC, a not-for-profit company, is the Management and Operating (M&O) contractor for DOE on the ORNL site. As part of ORNL's EM program, legacy inactive facilities (i.e., reactors, nuclear material research facilities, burial grounds, and underground storage tanks) are transferred to BJC and are designated as remediation, decontamination and decommissioning (D&D), or long-term surveillance and maintenance (S&M) facilities. Facilities operated by both UT-Battelle and BJC are interspersed throughout the site and are usually in close proximity. Both UT-Battelle and BJC have DOE-approved Radiation Protection Programs established in accordance with 10 CFR 835. The BJC Radiological Control (RADCON) Program adapts to the M&I framework and is comprised of a combination of subcontracted program responsibilities with BJC oversight. This paper focuses on the successes and challenges of executing the BJC RADCON Program for BJC's ORNL Project through a joint M&I contractor relationship, while maintaining a positive working relationship and partnership with UT-Battelle's Radiation Protection organization.

【 预 览 】
附件列表
Files Size Format View
DE2004829617.pdf 46KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:7次