Risk mitigation tests have been conducted by the NASA Glenn Research Center and The Aerospace Corporation in support of the DART Mission. The tests focused on NEXT performance characterizations intended to ensure its operations and characteristics are compatible with the DART mission operations, and to assist in the definition of the propulsion system. Tests were performed at the Aerospace Corporation and they involved: flow sensitivity-analyses, steady-state performance characterizations, and measurements of thruster erosion. The tests also involved defining, demonstrating, verifying, and evaluating the start-up sequences and a beam current regulation algorithm consistent with DART mission requirements. It was found that NEXT thruster operations are compatible with the proposed relaxation of flow control ranges for ignition and for steady-state operation.