科技报告详细信息
Optical Engineering History of the James Webb Space Telescope (JWST)
Feinberg, Lee
关键词: JAMES WEBB SPACE TELESCOPE;    SEGMENTED MIRRORS;    SPACEBORNE TELESCOPES;    INFRARED TELESCOPES;    SATELLITE-BORNE INSTRUMENTS;    CRYOGENIC TEMPERATURE;    EUROPEAN SPACE AGENCY;    CANADIAN SPACE PROGRAM;    NASA SPACE PROGRAMS;    SPACE PROGRAMS;   
RP-ID  :  GSFC-E-DAA-TN72968
美国|英语
来源: NASA Technical Reports Server
PDF
【 摘 要 】
Mission Objective: Study the origin and evolution of galaxies, stars and planetary systems; Optimized for infrared observations (0.6 to 28 microns). Organization: Mission Lead, Goddard Space Flight Center; International collaboration with ESA (European Space Agency) & CSA (Canadian Space Agency); Prime Contractor, Northrop Grumman Aerospace Systems; Telescope Subcontractors, Ball Aero-pace, Harris Corp, Orbital ATK. Instruments: Near Infrared Camera (NIRCam) - University of Arizona; Near Infrared Spectrograph (NIRSpec) - ESA; Mid-Infrared Instrument (MIRI) - JPL (Jet Propulsion Lab)/ESA; Fine Guidance Sensor (FGS) - CSA; Operations: Space Telescope Science Institute (STScI). Description: Deployable telescope with 6.5-meter-diameter segmented adjustable primary mirror; Cryogenic temperature telescope and instruments for infrared performance; 50 degrees Kelvin, minus 370 degrees Fahrenheit; 5-year science mission (10-year goal).
【 预 览 】
附件列表
Files Size Format View
20190030839.pdf 20174KB PDF download
  文献评价指标  
  下载次数:3次 浏览次数:11次