Program Promotion Can Distort Space Systems Engineering and Deny Risk
Jones, Harry W
关键词: RISK MANAGEMENT;    RISK ASSESSMENT;    LIFE SUPPORT SYSTEMS;    SYSTEMS ENGINEERING;    AEROSPACE ENGINEERING;    SPACE MISSIONS;    RECYCLING;    MATERIALS RECOVERY;    LIFE CYCLE COSTS;    COST ANALYSIS;   
RP-ID  :  ARC-E-DAA-TN69481
美国|英语
来源: NASA Technical Reports Server
PDF
【 摘 要 】

NASA's spectacular success in the Apollo moon landings was achieved against the odds by an obsessive dedication to reducing the great risk. But risk analysis predicted so many astronaut fatalities that it was thought to be unreasonably pessimistic and potentially damaging to the Apollo program. Risk analysis was discontinued, risk was neglected in space shuttle engineering, and so the space shuttle design was unnecessarily dangerous. Since the Apollo era it has been understood that long human space missions would recycle oxygen and water to avoid the very high launch cost of directly supplying them. The development of recycling systems was justified by the need to increase material closure and reduce launch mass. When it was recognized that increasing closure leads to rapidly diminishing returns, the program goal was changed to reducing launch mass and reliability, cost, and risk were considered irrelevant. Systems engineering and especially the discouraging problems of risk and cost have been deliberately ignored because they detract from program promotion, with unfortunate results. Current human launch system design does account for risk and the result strongly resembles Apollo. Current life support design continues to assume recycling, even though the recent great reduction in launch cost now allows direct supply of oxygen and water with significantly better quality, reliability, cost, and risk.

【 预 览 】
附件列表
Files Size Format View
20190027320.pdf 258KB PDF download
  文献评价指标  
  下载次数:23次 浏览次数:32次