Airdrop testing of parachutes is a complicated endeavor that requires the custom design and certification of many critical components. The most direct path to certifying a component is to perform full scale testing with margin over the maximum loads expected to be seen in operation. However, other constraints often preclude the opportunity to perform full scale testing. In this paper, we present a case study where a problem arises in a joint that had been certified with a full scale test. There was no time or budget available to repeat the full scale testing after a redesign of the joint. Instead, we present a method of testing each failure mode at the component level to support a certification by analysis approach. The analysis itself was not complicated, but tradeoffs had to be made between different failure modes to arrive at the optimal design. The same approach was also applied back to the original joint to confirm that the failure mode that was not seen in full scale testing would have been caught by the proposed analysis. In the end, the new design was certified by analysis and worked without issue for the final six airdrop tests that used this joint.