科技报告详细信息
Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences
Parker, Joel J K ; Lebois, Ryan L ; Lutz, Stephen ; Nickel, Craig ; Ferrant, Kevin ; Michaels, Adam
关键词: AERODYNAMICS;    ECLIPSES;    EXTRASOLAR PLANETS;    FLYBY MISSIONS;    MISSION PLANNING;    STABILITY;    LOOPS;    LUNAR ORBITS;    STATIONKEEPING;   
RP-ID  :  GSFC-E-DAA-TN63271,GSFC-E-DAA-TN59338,AAS 18-408
学科分类:天文学(综合)
美国|英语
来源: NASA Technical Reports Server
PDF
【 摘 要 】
The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.
【 预 览 】
附件列表
Files Size Format View
20180006156.pdf 4137KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:10次