Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress | |
O' ; Rourke, Ronald | |
Library of Congress. Congressional Research Service. | |
关键词: Defense policy; Transportation; Budgets; Shipbuilding - U.S. - Government spending; | |
RP-ID : RL32665 RP-ID : RL32665_2006Aug14 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The Navy in February 2006 proposed to maintain in coming years a fleet of 313 ships, including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88 cruisers and destroyers, 55 Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction amphibious and sealift-type ships. The Navy says that for its shipbuilding plans to be affordable and executable, the Navy needs to control certain non-shipbuilding expenditures and build ships within estimated costs. The Navy's shipbuilding plans raise potential issues regarding the shipbuilding industrial base, particularly in the areas of the submarine design and engineering base, and the surface combatant construction base.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
RL32665_2006Aug14.pdf | 277KB | download |