科技报告详细信息
QuickSim Analysis Report
Athalye, Rahul A. ; Gowri, Krishnan ; Glazer, Jason ; Schultz, Robert W.
Pacific Northwest National Laboratory (U.S.)
关键词: Feedback;    Sensitivity Analysis;    Engines;    Compliance;    Simulation;   
DOI  :  10.2172/992819
RP-ID  :  PNNL-19961
RP-ID  :  AC05-76RL01830
RP-ID  :  992819
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

In software tools such as COMcheck, use of the EnergyPlus simulation engine for performance-based code compliance raises a concern about simulation runtime which impacts the dynamic feedback of compliance results to the user. EnergyPlus annual simulations for proposed and code base line building models, and the mechanical equipment sizing runs together increase the annual simulation runtime beyond unacceptable duration, for example, to 5 minutes for a typical small commercial building. This report presents a study undertaken to compare the results of a shortened simulation time period, using 4 weeks of weather data to do a simulation of a full 52 weeks of data. Three representative building types and three climate zones were used for determining the validity of using shortened simulation run period. Further sensitivity analysis and run time comparisons were made to evaluate the robustness and run time savings of using this approach. The results of this analysis show that the shortened simulation run period provides compliance index calculations within 1% of that predicted using annual simulation results, and typically saves about 75% of simulation runtime.

【 预 览 】
附件列表
Files Size Format View
992819.pdf 556KB PDF download
  文献评价指标  
  下载次数:19次 浏览次数:17次