科技报告详细信息
Summary of Differences in Approach to Executing the NGNP Project
Hildebrandt, P.C.
Idaho National Laboratory
关键词: Neac;    Program Management;    Us Doe;    Ngnp;    42 Engineering;   
DOI  :  10.2172/991884
RP-ID  :  INL/EXT-10-19566
RP-ID  :  DE-AC07-05ID14517
RP-ID  :  991884
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The following discuss the summary differences between the NGNP Industry Alliance’s approach to execution of the NGNP Project as described in its Project Execution Strategy, and that included in the DOE’s Report to Congress on the Next Generation Nuclear Plant dated April 2010. These summary differences are not a comprehensive description of the results of a detailed gap analysis, but rather are those differences that warrant discussion in meetings between DOE executives and the private sector represented by the Alliance. In practical fact, the full range and content of the differences will not be understood until such time as detailed discussions are engaged between the DOE and the Alliance to develop a mutually agreed-to project execution plan.

【 预 览 】
附件列表
Files Size Format View
991884.pdf 1082KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:12次