科技报告详细信息
A Checkout of the Beam-Line's Beam Position Measurement Systems
Gollwitzer, Keith
Fermi National Accelerator Laboratory
关键词: Digitizers;    43 Particle Accelerators;    Accelerators;    Connectors;    Plates Accelerators;   
DOI  :  10.2172/984576
RP-ID  :  FERMILAB-PBAR-NOTE-658
RP-ID  :  AC02-07CH11359
RP-ID  :  984576
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This pbar note is to describe a recent checkout of the AP3, AP2, AP1 and P2 (F11 to F17) Beam Position Measurement (BPM) systems. The integrity of all BPMs (plates, cables, connectors and RF module) were performed. For each beam-line, the BPM positions polarity were checked: all of the horizontal (vertical) BPMs of a beam-line are to be consistent in defining left/right (up/down) by the sign of the position. The plates impedances have been measured. The position offsets at the output of the RF modules due to cable and connector differences were determined. Anytime an Energy Doubler BPM RF module (EE-107660) was found not working, a working spare was inserted; three AP2 RF modules were replaced. One connector for one of the cables of BPM728 was repaired. Two new cables were pulled and terminated for BPM716 since there was >8dB difference between the cables. In addition, three digitizer boards were replaced.

【 预 览 】
附件列表
Files Size Format View
984576.pdf 23KB PDF download
  文献评价指标  
  下载次数:29次 浏览次数:19次