| A Checkout of the Beam-Line's Beam Position Measurement Systems | |
| Gollwitzer, Keith | |
| Fermi National Accelerator Laboratory | |
| 关键词: Digitizers; 43 Particle Accelerators; Accelerators; Connectors; Plates Accelerators; | |
| DOI : 10.2172/984576 RP-ID : FERMILAB-PBAR-NOTE-658 RP-ID : AC02-07CH11359 RP-ID : 984576 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
This pbar note is to describe a recent checkout of the AP3, AP2, AP1 and P2 (F11 to F17) Beam Position Measurement (BPM) systems. The integrity of all BPMs (plates, cables, connectors and RF module) were performed. For each beam-line, the BPM positions polarity were checked: all of the horizontal (vertical) BPMs of a beam-line are to be consistent in defining left/right (up/down) by the sign of the position. The plates impedances have been measured. The position offsets at the output of the RF modules due to cable and connector differences were determined. Anytime an Energy Doubler BPM RF module (EE-107660) was found not working, a working spare was inserted; three AP2 RF modules were replaced. One connector for one of the cables of BPM728 was repaired. Two new cables were pulled and terminated for BPM716 since there was >8dB difference between the cables. In addition, three digitizer boards were replaced.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 984576.pdf | 23KB |
PDF