In 1992-1993, Argonne National Laboratory investigated potential carbon tetrachloride contamination that might be linked to the former grain storage facility operated by the Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) at Utica, Nebraska. These initial studies identified carbon tetrachloride in a plume of contaminated groundwater, extending approximately 3,500 ft southeastward from the former CCC/USDA facility, within a shallow upper aquifer that had been used previously as a municipal water source by the town (Figure 1.1). A deeper aquifer used as the current municipal water source was found to be free of carbon tetrachloride contamination. Although the shallow aquifer was no longer being used as a source of drinking water at Utica, additional studies indicated that the carbon tetrachloride could pose an unacceptable health threat to potential future residents who might install private wells along the expected downgradient migration pathway of the plume. On the basis of these findings, corrective action was recommended to decrease the carbon tetrachloride concentrations in the upper aquifer to acceptable levels (Argonne 1993a,b, 1995). Initial discussions with the Utica village board indicated that any restoration strategies involving nonbeneficial discharge of treated groundwater in the immediate vicinity of Utica would be unacceptable to the town. To address this concern, the CCC/USDA and Argonne, in cooperation with multiple federal and state regulatory and environmental agencies (Table 1.1) proposed a treatment strategy for the Utica groundwater employing groundwater extraction coupled with the seasonal use of agricultural spray irrigation equipment to simultaneously (1) remove carbon tetrachloride from the groundwater (by volatilization to the atmosphere) and (2) discharge the treated groundwater to enhance the development of wetlands in the North Lake Basin Wildlife Management Area, just north of the town (Argonne 2000). To develop this treatment approach, additional groundwater sampling was conducted to update the distribution of carbon tetrachloride in groundwater identified in the preliminary studies in 1992-1993. In March 1998, detailed mapping of the carbon tetrachloride plume was performed by using the Argonne cone penetrometer (CPT) vehicle to collect groundwater samples for analyses for volatile organic compounds (VOCs) at 13 locations (PS01-PS09, PS12, PS16, PS17, PS19; Figure 1.2). The samples were collected in vertical profiles through the aquifer, at 10-ft intervals. The results of this 1998 study (Table 1.2) demonstrated that the three-dimensional distribution of carbon tetrachloride in the aquifer is complex, with multiple 'hot spots' occurring in the plume at various depths and distances along its length (Argonne 2000). In October 2002, the CCC/USDA requested that Argonne perform targeted groundwater sampling at Utica to document the migration of the carbon tetrachloride plume since the 1998 sampling event. In February 2003, vertical-profile groundwater sampling for VOCs analyses was conducted at 8 selected locations (PS01, PS04-PS07, PS12, PS19, PS20; Figure 1.2 and Table 1.3). The lateral and vertical configuration of the carbon tetrachloride plume, as identified in the 2003 study (Argonne 2003), is illustrated in Figures 1.3-1.7. On the basis of the 2003 groundwater sampling results, a remedial system employing four extraction wells (GWEX 1-GWEX 4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented at Utica, with the concurrence of the CCC/USDA and the agencies identified in Table 1.1. The principal components of the Utica system (shown in Figure 1.8) are described briefly in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
982346.pdf | 1203KB | download |