科技报告详细信息
Fifth Annual Report: 2008 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation
Woodruff, Dana L. ; Judd, Chaeli ; Thom, Ronald M. ; Sather, Nichole K. ; Kaufmann, Ronald M.
Pacific Northwest National Laboratory (U.S.)
关键词: Eelgrass;    Monitoring;    Habitat;    Puget Sound;    Land Reclamation;   
DOI  :  10.2172/981578
RP-ID  :  PNNL-15678-5
RP-ID  :  AC05-76RL01830
RP-ID  :  981578
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, including harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).

【 预 览 】
附件列表
Files Size Format View
981578.pdf 1444KB PDF download
  文献评价指标  
  下载次数:21次 浏览次数:38次