科技报告详细信息
EFRT M-12 Issue Resolution: Solids Washing
Baldwin, David L. ; Schonewill, Philip P. ; Toth, James J. ; Huckaby, James L. ; Eslinger, Paul W. ; Hanson, Brady D. ; Kurath, Dean E. ; Minette, Michael J.
Pacific Northwest National Laboratory (U.S.)
关键词: Leaching;    Pretreatment Engineering Platform;    Flowsheets;    Radioactive Wastes;    Demonstration Programs Pretreatment Engineering Platform;   
DOI  :  10.2172/973978
RP-ID  :  PNNL-18499 Rev 1
RP-ID  :  AC05-76RL01830
RP-ID  :  973978
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes” of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

【 预 览 】
附件列表
Files Size Format View
973978.pdf 6205KB PDF download
  文献评价指标  
  下载次数:22次 浏览次数:9次