科技报告详细信息
Accelerator/Experiment Operations - FY 2009
Andrews, M.N ; Appel, J.A. ; Brice, S. ; Casarsa, M. ; Coleman, R. ; Denisov, d. ; Ginther, G. ; Gruenendahl, S. ; Holmes, S. ; Kissel, W. ; Lee, W.M. ; /Fermilab
Fermi National Accelerator Laboratory
关键词: Fermilab Tevatron;    43 Particle Accelerators;    Mesons;    Neutrino Beams Accelerators;    Accelerators;   
DOI  :  10.2172/971006
RP-ID  :  FERMILAB-TM-2453-DI
RP-ID  :  AC02-07CH11359
RP-ID  :  971006
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2009. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2009 Run II at the Tevatron Collider, MINOS using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.

【 预 览 】
附件列表
Files Size Format View
971006.pdf 1076KB PDF download
  文献评价指标  
  下载次数:14次 浏览次数:16次