科技报告详细信息
Vogtle Electric Generating Plant ETE Analysis Review
Diediker, Nona H. ; Jones, Joe A.
Pacific Northwest National Laboratory (U.S.)
关键词: Recommendations;    Evacuation;    Nureg;    Nrc;    Rai;   
DOI  :  10.2172/963248
RP-ID  :  PNNL-16275
RP-ID  :  AC05-76RL01830
RP-ID  :  963248
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Under contract with the Nuclear Regulatory Commission (NRC), staff from Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratory (SNL)-Albuquerque reviewed the evacuation time estimate (ETE) analysis dated April 2006 prepared by IEM for the Vogtle Electric Generating Plant (VEGP). The ETE analysis was reviewed for consistency with federal regulations using the NRC guidelines in Review Standard (RS)-002, Supplement 2 and Appendix 4 to NUREG-0654, and NUREG/CR-4831. Additional sources of information referenced in the analysis and used in the review included NUREG/CR-6863 and NUREG/CR-6864. The PNNL report includes general comments, data needs or clarifications, and requests for additional information (RAI) resulting from review of the ETE analysis.

【 预 览 】
附件列表
Files Size Format View
963248.pdf 155KB PDF download
  文献评价指标  
  下载次数:6次 浏览次数:14次