The Independent Technical Analysis Process Final Report 2006-2007. | |
Duberstein, Corey ; Ham, Kenneth ; Dauble, Dennis ; Johnson, Gary | |
United States. Bonneville Power Administration. | |
关键词: Bonneville Power Administration; Storage; Adults; Juveniles; Recommendations; | |
DOI : 10.2172/961996 RP-ID : DOE/BP-00000652-37 RP-ID : 652 REL 36 RP-ID : 961996 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related to juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
961996.pdf | 395KB | download |