科技报告详细信息
Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring and Evaluation FY08 Annual Report.
Johnson, GE ; Diefenderfer, HL
United States. Bonneville Power Administration.
关键词: Columbia River;    Program Management;    Recommendations;    Implementation;    Us Bureau Of Reclamation;   
DOI  :  10.2172/961985
RP-ID  :  P108420
RP-ID  :  26934 REL 10
RP-ID  :  961985
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

【 预 览 】
附件列表
Files Size Format View
961985.pdf 754KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:13次