科技报告详细信息
Recent Results on Muon Capture for a Neutrino Factory and Muon Collider
Neuffer, David
Fermi National Accelerator Laboratory
关键词: Proton Sources;    Luminosity;    43 Particle Accelerators;    Rotation Accelerators;    Neutrinos;   
DOI  :  10.2172/961955
RP-ID  :  FERMILAB-TM-2433-APC
RP-ID  :  AC02-07CH11359
RP-ID  :  961955
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Scenarios for capture, bunching and phase-energy rotation of {mu}'s from a proton source have been developed. The goal is capture of a maximal number of muons in a string of rf bunches with applications in neutrino factories and {mu}{sup +}-{mu}{sup -} colliders. In this note we begin with the bunching, phase rotation and cooling scenario used in neutrino factory study 2B and adapted by R. Palmer as the initial stage of a {mu}{sup +}-{mu}{sup -} collider scenario. However the scenario produces a relatively large number of bunches that must be recombined for maximal collider luminosity. In this paper we modify the scenario to obtain a smaller number of bunches, and, after some optimization, obtain cases that are better for both n-factory and collider scenarios. We describe these examples and consider some variations toward an optimal {nu}-factory + collider scenario.

【 预 览 】
附件列表
Files Size Format View
961955.pdf 1033KB PDF download
  文献评价指标  
  下载次数:13次 浏览次数:24次