Independent Verification Final Summary Report for the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee | |
Weaver, P.C. | |
Oak Ridge Institute for Science and Education | |
关键词: 61 Radiation Protection And Dosimetry; Soils; Uranium 238; Independent Verification Final Summary Report; Verification Independent Verification Final Summary Report; | |
DOI : 10.2172/959411 RP-ID : ORISE 0465-SR-05-0 RP-ID : DE-AC05-06OR23100 RP-ID : 959411 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
959411.pdf | 1709KB | download |