科技报告详细信息
Engineering Evaluation Report on K-311-1 Floor Subsidence (2008 Annual Report) at the East Tennessee Technology Park, Oak Ridge, Tennessee
R.B., Knott
East Tennessee Technology Park (ETTP), Oak Ridge, TN
关键词: Removal K-311-1, Floor Subsidence, Engineering Evaluation Report, 2008 Annual Report;    Floors;    Demolition;    Planning;    K-311-1, Floor Subsidence, Engineering Evaluation Report, 2008 Annual Report;   
DOI  :  10.2172/949955
RP-ID  :  BJC/OR-2345 R3
RP-ID  :  DE-AC05-98OR22700
RP-ID  :  949955
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The purpose of this task is to evaluate the effect of floor settlement on building structure, piping, and equipment foundations between column lines 1 and 2 and B and K of Bldg. K-311-1 (see Fig. A-1 in Appendix A) at East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee. Revision 0 of this document covers the 2005 annual inspection. Revision 1 addresses the 2006 annual inspection, Revision 2 addresses the 2007 annual inspection, and Revision 3 covers the 2008 annual inspection, as indicated by the changed report title. A civil survey and visual inspection were performed. Only a representative number of points were measured during the 2008 survey. The exact location of a number of survey points in Table A-1 could not be accurately determined in the 2008 survey since these points had not been spray painted since 2003. The points measured are deemed adequate to support the conclusions of this report. Based on the survey and observations, there has been no appreciable change in the condition of the unit since the 2007 inspection. The subsidence of the floor presents concerns to the building structure due to the possible indeterminate load on the pipe gallery framing. Prior to demolition activities that involve the piping or removal of the equipment, such as vent, purge and drain and foaming, engineering involvement in the planning is necessary. The piping connected to the equipment is under stress, and actions should be implemented to relieve this stress prior to disturbing any of the equipment or associated piping. In addition, the load on the pipe gallery framing needs to be relieved prior to any activities taking place in the pipe gallery. Access to this area and the pipe gallery is not allowed until the stress is released.

【 预 览 】
附件列表
Files Size Format View
949955.pdf 2562KB PDF download
  文献评价指标  
  下载次数:10次 浏览次数:12次