科技报告详细信息
Dormaier and Chester Butte 2007 Follow-up Habitat Evaluation Procedures Report.
Ashley, Paul R.
United States. Bonneville Power Administration.
关键词: Bonneville Power Administration;    Habitat;    Mitigation;    Construction;    54 Environmental Sciences;   
DOI  :  10.2172/947115
RP-ID  :  P106527
RP-ID  :  not available
RP-ID  :  947115
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Follow-up habitat evaluation procedures (HEP) analyses were conducted on the Dormaier and Chester Butte wildlife mitigation sites in April 2007 to determine the number of additional habitat units to credit Bonneville Power Administration (BPA) for providing funds to enhance, and maintain the project sites as partial mitigation for habitat losses associated with construction of Grand Coulee Dam. The Dormaier follow-up HEP survey generated 482.92 habitat units (HU) or 1.51 HUs per acre for an increase of 34.92 HUs over baseline credits. Likewise, 2,949.06 HUs (1.45 HUs/acre) were generated from the Chester Butte follow-up HEP analysis for an increase of 1,511.29 habitat units above baseline survey results. Combined, BPA will be credited with an additional 1,546.21 follow-up habitat units from the Dormaier and Chester Butte parcels.

【 预 览 】
附件列表
Files Size Format View
947115.pdf 8567KB PDF download
  文献评价指标  
  下载次数:15次 浏览次数:14次