科技报告详细信息
Remaining Sites Verification Package for the 600-111, P-11 Critical Mass Laboratory Crib, and UPR-600-16, Fire and Contamination Spread Waste Sites, Waste Site Reclassification Form 2004-065
Capron, J. M.
Washington Closure Hanford
关键词: Criticality;    Verification Sampling;    Columbia River;    Wastes Hanford;    12 Management Of Radioactive And Non-Radioactive Wastes From Nuclear Facilities;   
DOI  :  10.2172/944188
RP-ID  :  RSVP-2004-065
RP-ID  :  DE-AC06-05RL14655
RP-ID  :  944188
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The 600-111, P-11 Critical Mass Laboratory Crib waste site, also referred to as the P-11 Facility, included the 120 Experimental Building, the 123 Control Building, and the P-11 Crib. The facility was constructed in 1949 and was used as a laboratory for plutonium criticality studies. In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The results of confirmatory and verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

【 预 览 】
附件列表
Files Size Format View
944188.pdf 24795KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:15次