科技报告详细信息
Ultrasonic Examination of Double-Shell Tank 241-AP-107 Examination Completed February 2008
Pardini, Allan F. ; Weier, Dennis R. ; Anderson, Kevin K.
Pacific Northwest National Laboratory (U.S.)
关键词: Corrosion;    241-Ap-107;    Radioactive Waste Storage;    Weibull;    Walls;   
DOI  :  10.2172/939045
RP-ID  :  PNNL-17488 Rev. 1
RP-ID  :  AC05-76RL01830
RP-ID  :  939045
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

AREVA Federal Services LLC (AFS), under a contract from CH2M HILL Hanford Group (CH2M HILL), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AP-107. The purpose of this examination was to provide information that could be used to evaluate the integrity of the wall of the primary tank. The requirements for the ultrasonic examination of Tank 241-AP-107 were to detect, characterize (identify, size, and locate), and record measurements made of any wall thinning, pitting, or cracks that might be present in the wall of the primary tank. Any measurements that exceed the requirements set forth in the Engineering Task Plan (ETP), RPP-Plan-34301 (Castleberry 2007) and summarized on page 1 of this document, are to be reported to CH2M HILL and the Pacific Northwest National Laboratory (PNNL) for further evaluation. Under the contract with CH2M HILL, all data is to be recorded on electronic media and paper copies of all measurements are provided to PNNL for third-party evaluation. PNNL is responsible for preparing a report(s) that describes the results of the AFS ultrasonic examinations.

【 预 览 】
附件列表
Files Size Format View
939045.pdf 542KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:27次