科技报告详细信息
Facility Configuration Study of the High Temperature Gas-Cooled Reactor Component Test Facility | |
Austad, S. L. ; Guillen, L. E. ; Ferguson, D. S. ; Blakely, B. L. ; Pace, D. M. ; Lopez, D. ; Zolynski, J. D. ; Cowley, B. L. ; Balls, V. J. ; E.A. Harvego, P.E. ; C.W. McKnight, P.E. ; Stewart, R.S. ; Christensen, B.D. | |
Idaho National Laboratory | |
关键词: Heat Transfer; Hydrogen Production; Test Loops; Hgtr; Railways; | |
DOI : 10.2172/938444 RP-ID : INL/EXT-08-14132 RP-ID : DE-AC07-99ID-13727 RP-ID : 938444 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
A test facility, referred to as the High Temperature Gas-Cooled Reactor Component Test Facility or CTF, will be sited at Idaho National Laboratory for the purposes of supporting development of high temperature gas thermal-hydraulic technologies (helium, helium-Nitrogen, CO2, etc.) as applied in heat transport and heat transfer applications in High Temperature Gas-Cooled Reactors. Such applications include, but are not limited to: primary coolant; secondary coolant; intermediate, secondary, and tertiary heat transfer; and demonstration of processes requiring high temperatures such as hydrogen production. The facility will initially support completion of the Next Generation Nuclear Plant. It will secondarily be open for use by the full range of suppliers, end-users, facilitators, government laboratories, and others in the domestic and international community supporting the development and application of High Temperature Gas-Cooled Reactor technology. This pre-conceptual facility configuration study, which forms the basis for a cost estimate to support CTF scoping and planning, accomplishes the following objectives: • Identifies pre-conceptual design requirements • Develops test loop equipment schematics and layout • Identifies space allocations for each of the facility functions, as required • Develops a pre-conceptual site layout including transportation, parking and support structures, and railway systems • Identifies pre-conceptual utility and support system needs • Establishes pre-conceptual electrical one-line drawings and schedule for development of power needs.【 预 览 】
Files | Size | Format | View |
---|---|---|---|
938444.pdf | 8845KB | download |