科技报告详细信息
Summary of Bounding Requirements for the NGNP Demonstration Plant F&ORs
Idaho National Laboratory
关键词: Demonstration Plant;    Functionals;    Bounding Requirements;    Ngnp;    Specifications Bounding Requirements;   
DOI  :  10.2172/934548
RP-ID  :  INL/EXT-08-14395
RP-ID  :  DE-AC07-99ID-13727
RP-ID  :  934548
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

This report documents bounding functional and operating requirements (F&ORs)for the Next Generation Nuclear Plant (NGNP) Project to support selection of the nuclear system design and specification of the operating conditions and configuration of NGNP once the nuclear system design is selected. These requirements supplement the detailed F&ORs for NGNP developed in the FY07 NGNP Pre-conceptual design work.

【 预 览 】
附件列表
Files Size Format View
934548.pdf 695KB PDF download
  文献评价指标  
  下载次数:9次 浏览次数:15次