科技报告详细信息
2006 Update of Business Downtime Costs
Hinrichs, Doug ; Goggin, Michael
Oak Ridge National Laboratory
关键词: Industry;    Cost;    24 Power Transmission And Distribution;    32 Energy Conservation, Consumption, And Utilization;    Commercial Sector;   
DOI  :  10.2172/931299
RP-ID  :  ORNL/TM-2006/592
RP-ID  :  DE-AC05-00OR22725
RP-ID  :  931299
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

The objective of this paper is to assess the downtime cost of power outages to businesses in the commercial and industrial sectors, updating and improving upon studies that have already been published on this subject. The goal is to produce a study that, relative to existing studies, (1) applies to a wider set of business types (2) reflects more current downtime costs, (3) accounts for the time duration factor of power outages, and (4) includes data on the costs imposed by real outages in a well-defined market. This study examines power outage costs in 11 commercial subsectors and 5 industrial subsectors, using data on downtime costs that was collected in the 1990's. This study also assesses power outage costs for power outages of 20 minutes, 1 hour, and 4 hours duration. Finally, this study incorporates data on the costs of real power outages for two business subsectors. However, the current limited state of data availability on the topic of downtime costs means there is room to improve upon this study. Useful next steps would be to generate more recent data on downtime costs, data that covers outages shorter than 20 minutes duration and longer than 4 hours duration, and more data that is based on the costs caused by real-world outages. Nevertheless, with the limited data that is currently available, this study is able to generate a clear and detailed picture of the downtime costs that are faced by different types of businesses.

【 预 览 】
附件列表
Files Size Format View
931299.pdf 636KB PDF download
  文献评价指标  
  下载次数:8次 浏览次数:22次