科技报告详细信息
| National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota | |
| Sweetzer, Richard ; Leslie, Neil | |
| Oak Ridge National Laboratory | |
| 关键词: North Dakota; Pipelines; Compressors; 32 Energy Conservation, Consumption, And Utilization; Energy Recovery; | |
| DOI : 10.2172/931039 RP-ID : ORNL/TM-2007/158 RP-ID : DE-AC05-00OR22725 RP-ID : 931039 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 931039.pdf | 14773KB |
PDF