科技报告详细信息
WIPP Subsidence Monument Leveling Survey - 2005
Westinghouse TRU Solutions LLC
Waste Isolation Pilot Plant (N.M.)
关键词: Redundancy;    M&;    Te;    Waste Isolation Pilot Plant;    Personnel;   
DOI  :  10.2172/925614
RP-ID  :  DOE/WIPP-06-2293
RP-ID  :  AC29-01AL66444
RP-ID  :  925614
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Sections 2 through 7 of this report define the result of the 2005 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2005 survey includes the determination of elevation on each of the 48 existing subsidence monuments and the WIPP baseline survey, and 14 of the National Geodetic Survey’s (NGS) vertical control points. The field observations were completed during September through November of 2005 by personnel from the Washington TRU Solutions (WTS) Surveying Group, Mine Engineering Department. Additional rod personnel were provided by the Geotechnical Engineering Department. Digital leveling techniques were utilized to achieve better than Second Order Class II loop closures as outlined by the Federal Geodetic Control Subcommittee (FGCS). Because it is important to perform the subsidence survey in exactly the same manner each year, WIPP procedure (WP 09-ES4001) details each step of the survey. Starting with the 2002 survey this procedure has been used to perform the subsidence survey. Starting with the survey of the year 2001, Loop 1 and redundant survey connections among the various loops were removed from the survey and report. This resulted in a reduction of fieldwork with no loss of accuracy or precision. The redundant connections caused multiple elevations for the same stations. The differences were so slight that they were not used in elevation adjustments for the loops. The redundancy was used to spot gross errors in the field. After several years of surveying these loops it is evident that no gross errors occur that are not also evident in the loop closures. Finally, Section 8 contains Table F, which summarizes the elevations for all surveys from 1987 through 2005, inclusive. A detailed listing of the 1986 through 1997 surveys is contained in the report, WIPP Subsidence Monument Leveling Surveys 1986-1997, DOE/WIPP 98-2293. A reference to the summary reports for each year after 1997 is listed in the reference section of this document.

【 预 览 】
附件列表
Files Size Format View
925614.pdf 386KB PDF download
  文献评价指标  
  下载次数:17次 浏览次数:22次