科技报告详细信息
Analysis of the Costs of a Backlog Project in Response to Recommendation 2 of the 2004 Archives and History Office Program Review Committee Report
O' ; Hara, Laura
Stanford Linear Accelerator Center
关键词: Management;    Storage;    Recommendations;    43 Particle Accelerators;    Processing;   
DOI  :  10.2172/922220
RP-ID  :  SLAC-TN-07-030
RP-ID  :  AC02-76SF00515
RP-ID  :  922220
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

SLAC Archives and History Office (AHO) backlog of unprocessed material is over 3,000 cubic feet and growing. Because much of this material was directly transferred to off-site storage, the provenance and contents are a mystery. The costs of off-site storage, lack of knowledge of the contents, and the impending federal regulations in 2009 concerning storage facilities all suggest the need for a long-term plan for the backlog. AHO presents these options to SLAC management: (1) Continue with the status quo, adding new accessions to OffSite Records Management, LLC (hereinafter referred to as OffSite) storage; (2) Pull the backlog back a segment at a time for box-level processing, determine what is in each box, get rid of extraneous material, and return what is left to OffSite storage; (3) Gradually retrieve the backlog for thorough, folder-level processing and then transfer to the Federal Records Center in San Bruno (hereinafter referred to as FRC) or the Archives side of the operations at the National Archives and Records Administration in San Bruno (hereinafter referred to as NARA); and (4) Gradually retrieve the backlog for a combination of box-level processing with return to OffSite storage and thorough folder-level processing with transfer to FRC or NARA.

【 预 览 】
附件列表
Files Size Format View
922220.pdf 213KB PDF download
  文献评价指标  
  下载次数:5次 浏览次数:10次