Storage and Aging Effects on Spherical Resorcinol-Formaldehyde Resin Ion Exchange Performance | |
Fiskum, Sandra K. ; Arm, Stuart T. ; Edwards, Matthew K. ; Steele, Marilyn J. ; Thomas, Kathie K. | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Ion Exchange Materials; Low-Level Radioactive Wastes; Age Dependence; Liquid Wastes; 36 Materials Science; | |
DOI : 10.2172/919703 RP-ID : PNNL-16832 RP-ID : AC05-76RL01830 RP-ID : 919703 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Bechtel National, Inc. (BNI) is evaluating the alternate Cs ion exchanger, spherical resorcinol-formaldehyde (RF), for use in the River Protection Project-Waste Treatment Plant (RPP-WTP).( ) Previous test activities with spherical RF indicate that it has adequate capacity, selectivity, and kinetics to perform in the plant according to the flowsheet needs. It appears to have better elution and hydraulic properties than the existing alternatives: ground-gel RF and SuperLig® 644 (SL 644).( ) To date, the spherical RF performance testing has been conducted on freshly manufactured resin (within ~2 months of manufacture). The ion exchange resins will be manufactured and shipped to the WTP up to 1 year before being used in the plant. Changes in the resin properties during storage could reduce the capacity of the resin to remove Cs from low-activity waste solutions. Active sites on organic SL-644 resin have been shown to degrade during storage (Arm et al. 2004). Additional testing was needed to study the effects of storage conditions and aging on spherical RF ion exchange performance. Variables that could have a significant impact on ion exchange resins during storage include storage temperature, medium, and time. Battelle—Pacific Northwest Division (PNWD) was contracted to test the effects of various storage conditions on spherical RF resin. Data obtained from the testing will be used by the WTP operations to provide direction for suitable storage conditions and manage the spherical RF resin stock. Storage test conditions included wet and dry resin configurations under nitrogen at three temperatures. Work was initially conducted under contract number 24590-101-TSA-W000-00004 satisfying the needs defined in Appendix C of the Research and Technology Plan( ) TSS A-219 to evaluate the impact of storage conditions on RF resin performance. In February 2007, the contract mechanism was switched to Pacific Northwest National Laboratory (PNNL) Operating Contract DE-AC05-76RL01830.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
919703.pdf | 953KB | download |