科技报告详细信息
Final Data Report: P- and S-Wave Velocity Logging Borings C4993, C4996, and C4997 Part A: Interval Logs
Steller, Robert ; Diehl, John
Pacific Northwest National Laboratory (U.S.)
关键词: Data Analysis;    Radioactive Waste Facilities;    Well Logging;    Boreholes;    Seismic S Waves;   
DOI  :  10.2172/912737
RP-ID  :  PNNL-16381
RP-ID  :  AC05-76RL01830
RP-ID  :  912737
美国|英语
来源: UNT Digital Library
PDF
【 摘 要 】

Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohay serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.

【 预 览 】
附件列表
Files Size Format View
912737.pdf 17277KB PDF download
  文献评价指标  
  下载次数:11次 浏览次数:10次