Final Data Report: P- and S-Wave Velocity Logging Borings C4993, C4996, and C4997 Part A: Interval Logs | |
Steller, Robert ; Diehl, John | |
Pacific Northwest National Laboratory (U.S.) | |
关键词: Data Analysis; Radioactive Waste Facilities; Well Logging; Boreholes; Seismic S Waves; | |
DOI : 10.2172/912737 RP-ID : PNNL-16381 RP-ID : AC05-76RL01830 RP-ID : 912737 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
Insitu borehole P- and S-wave velocity measurements were collected in three borings located within the Waste Treatment Plant (WTP) boundaries at the Hanford Site, southeastern Washington. Geophysical data acquisition was performed between August and October of 2006 by Rob Steller, Charles Carter, Antony Martin and John Diehl of GEOVision. Data analysis was performed by Rob Steller and John Diehl, and reviewed by Antony Martin of GEOVision, and report preparation was performed by John Diehl and reviewed by Rob Steller. The work was performed under subcontract with Battelle, Pacific Northwest Division with Marty Gardner as Battelle’s Technical Representative and Alan Rohay serving as the Technical Administrator for Pacific Northwest National Laboratory (PNNL). This report describes the field measurements, data analysis, and results of this work.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
912737.pdf | 17277KB | download |