科技报告详细信息
| AGR-1 Source Inspection Report for First Inspection | |
| Roberts, Gary D. ; Barnes, Charles M. | |
| Idaho National Laboratory | |
| 关键词: Calibration; Particle Coating; 11 - Nuclear Fuel Cycle And Fuel Materials; Production Agr; Ornl; | |
| DOI : 10.2172/911258 RP-ID : INL/EXT-05-00819 RP-ID : DE-AC07-99ID-13727 RP-ID : 911258 |
|
| 美国|英语 | |
| 来源: UNT Digital Library | |
PDF
|
|
【 摘 要 】
Battelle Energy Alliance (BEA) of the Idaho National Laboratory completed a source inspection at Oak Ridge National Laboratory on September 7 and 8th, 2005. The objective of this inspection was to ensure that all required data collection forms, data collection processes and methods of data acceptance are in place prior to starting the first Advanced Gas Reactor (AGR) particle coating production run. Material traceability and calibration requirements defined for Measuring and Test Equipment (M&TE) were also reviewed during this inspection.
【 预 览 】
| Files | Size | Format | View |
|---|---|---|---|
| 911258.pdf | 172KB |
PDF