Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III | |
Wells, R. P. | |
Idaho National Laboratory - Idaho Closure Project | |
关键词: Copper; Training Remedial Design/Remedial Action Work Plan; Monitoring; Recycling; Excavation; | |
DOI : 10.2172/908809 RP-ID : DOE/NE-ID-11202 RP-ID : DE-AC0705ID14516 RP-ID : 908809 |
|
美国|英语 | |
来源: UNT Digital Library | |
【 摘 要 】
The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.
【 预 览 】
Files | Size | Format | View |
---|---|---|---|
908809.pdf | 4036KB | download |